Quick
Search: 
 
advanced search
 GSW Home    GeoRef Home    My GSW Alerts    Contact GSW    About GSW    Journals List    Help 
Journal of Environmental & Engineering Geophysics Email Content Delivery
JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS

Journal of Environmental & Engineering Geophysics; June 2008; v. 13; issue. p. 51-56; DOI: 10.2113/JEEG13.2.51
© 2008 Environmental & Engineering Geophysical Society
This Article
Right arrow Figures Only
Right arrow Full Text
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Similar articles in Web of Science
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Dong, P.
Right arrow Articles by Qin, R.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation

Research Articles

Applying Mise-a-la-masse Method to Determine the Length of Reinforcement in Bored In situ Concrete Piles

Ping Dong*, Jingliang Fan1, Zhengzhou Chen1, Liangshu Wang1, Xinnan Gao1 and Ran Qin2

1 Department of Earth Sciences, Nanjing University Nanjing 210093 China
2 Lamont-Doherty Earth Observatory of Columbia University Palisades USA
* Department of Earth Sciences, Nanjing University 22 Hankou Road, Nanjing 210093 China dongping{at}ndjc.com

The strength of reinforced concrete pile is largely controlled by the steel reinforcement inside the pile. Finding an effective way to determine the length of the steel reinforcement in bored in situ concrete piles has been an urgent but difficult problem for the construction administration agencies in China. Taking advantage of the significant difference in the electrical conductivity between the steel reinforcement and the concrete pile body, we apply the mise-a-la-masse (MALM) method, which has traditionally been used in ore exploration and coal mining, to determine the reinforcement length of bored in situ concrete piles. Preliminary tests show that the voltage (electrical potential) curve sharply increases at the bottom of the steel reinforcements, where the voltage gradient curve also peaks. Thus, the MALM method could be an effective, fast and convenient way to determine the reinforcement length in bored in situ concrete piles. The MALM method may also be used in the survey of old steel piles, bridge footings and dam foundations whose configurations are not available.







JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2009 by Environmental & Engineering Geophysical Society